The following is the plan for the third dive of the day and its limitations.

  • NDL: 33 min.
  • Surface interval time: 3.5 hr. (210 min.)
  • Gas supply: 11.1 L/80 cu. ft. (Cylinder was refilled to 200 bar/3,000 psi.)
  • TOD: 15 m/49 ft.
  • Planned dive time: 24 min.
  • SAC rate: 16 L p/m or 0.58 cu. ft. p/m (taken from the second dive)

The limiting factor is the NDL on the third dive.